Recent Site Activities
Constructing a Drainage System on the Former Sulfate Basin 3.
7-12-02
The US Army Corp of Engineers Begins Demolition of the Former Shipping 5.
7-31-02
Constructing the Attic Fill Bridging Layer on the South Cell of the Former Sulfate Basin 1.
Excavation of Fly Ash for Reuse as Attic Fill has Greatly Reduced the Size of Fly Ash Mountain.
7-29-02
Removing Gutters from the Ceiling in the Former Viscose Cellar 6.
Tapping and Draining Pipes in the former Viscose Cellar 6.