Recent Site Activities
Field Geologist and Driller Installing a Groundwater Monitoring Well.
11-1-02
Grading the Foundation for the Geosynthetic Liner and Clay Cap on Sulfate Basin 4 11-1-02
Health and Safety Officers Inspect Sulfate Basin 3 Stormwater Drainage Discharge Point.
11-19-02
Sampling Team Purges Water from a Monitoring Well Before Collecting a Groundwater Sample.
Sulfate Basin 3 After the Geosynthetic Liner and Clay Cap Have Been Constructed and Surveyed.