Recent Site Activities
Fly Ash Slurry is Successfully Pumped to Sulfate Basin 4e During the Pilot Test of the Slurry Operation 1-9-03
Excavating Fly Ash from the top of Fly Ash Stockpile 1-15-03
Heat Lamps Warm Oil Filled Tanks to Allow the Oil to Drain Easily into 55 Gallon Containers 1-16-03
Geologists Log Well 604 Using Geophysical Techniques 1-20-03
Power Washing and Vacuuming the Floors on the 3rd floor of the Polymer Plant 1-23-03