Recent Site Activities
Reconstructed Wetlands. Fencing protects the newly planted wetlands plants in former Sulfate Basin #5 2 July 2003
Liner is placed on top of attic fill on Sulfate Basin #1 Cell #1 8 July 2003
Field Geologist collects a ground water sample during an aquifer pumping test 14 July 2003
Fly ash is placed on top of Sulfate Basin #4 for use as Attic Fill 17 July 2003
US Rep Frank Wolf visits the Avtex Fibers Superfund Site 28 July 2003
A bulldozer pushes cover soil on top of the liner on Sulfate Basin #1 Cell #1 30 July 2003