Recent Site Activities
Installing a Perimeter Drain around Sulfate Basin No. 4 08-12-03
Removing Large Stones from Cover Soil Prior to Use on Sulfate Basin No. 1 8-12-03
Placing Cover Soil on Top of Liner Material on Sulfate Basin No. 1 8-14-03
Sample Technicians Clean Soil Sampling Equipment Prior to Collecting the Next Sample 8-21-03
Grading Attic Fill on Sulfate Basin No. 4 8-22-03
US Army Corp of Engineers Crushes Concrete Floor into Manageable Debris Piles 8-29-03