Recent Site Activities (December 2003)
Removing Stumps and Roots from the west berm of Sulfate Basins.
Installing Gas Vent on Sulfate Basin 4.
Excavating Soil from Borrow Area A.
Excavating a Drainage Channel in Sulfate Basin 1.
Cover Soil on Sulfate Basin 4e.