Recent Site Activities (June 2006)
Collecting Depth to Groundwater Measurements -Viscose Basin No.10
Hydrostatic Testing Two Pillow Tanks - Viscose Basin No. 10 Treatability Study Work Area
Installing a Well Point in Viscose Basin No. 10
Methane Gas Vents in Sulfate Basin No.3
Removing Sediment from the Floor of Sulfate Basin No. 2
Students and Teachers from the VA Governors School Learn About the Site