Recent Site Activities (December 2006)
Collecting a soil sample from Geoprobe soil cores.
Demolishing the floor of a subgrade structure (no. 3).
Geoprobe operator and EPA oversite contractor inspect a soil core sample.
Removing temporary field trailer.
Smoothing out the excavation and bending rebar down.
Using a Geoprobe for soil sampling near former polymer plant.