Recent Site Activities (January 2007)
Engineer and Construction Manager Inspect former sulfate basin no. 4.
Former RR bed in the Plant Area.
Loading out beneficial re-use soil to former viscose basins no. 2 and 3.
US EPA, US Army Corps of Engineers, Front Royal-Warren County Economic Development Authority and FMC discuss redevelopment and site conditions.
Relocating Brine Pipe to the staging area.
Placing beneficial reuse soils on former viscose basins 2 and 3.