Recent Site Activities (December 2007)
Construction manager provides trench excavation oversight.
EPA Oversight Contractor (right) observing sediment sample collection.
Excavating soil and debris from the former Fan House No. 8 subgrade.
Site A holiday lunch celebration at the site.
Stockpiles of former Lead Shop area soils successfully stabilized.
Washing the wheels of a waste disposal truck before leaving the site.