Benching the slope on the west side of viscose basin 6. |

EPA full time on site oversight contractor inspects the leachage
conveyance system at viscose basins 4 - 6. |

Installing a leachate conveyance system around viscose basins 4
- 6. |

New leachate conveyance system manhole. |

Preparing the cover soil on viscose basins 4 - 6 before placing
plastic liner on top. |

Receiving imported soil to be used on the cover of viscose
basins 4 - 6. |