
Preparing to plant seed on the new cover system at Viscose
Basins 4 through 6. |

Excavating one foot of adjacent soils from a sewer excavation. |

Drainage channel on the new cover system on Viscose Basins 4
through 6. |

Disking the soil cover on Viscose Basins 4 through 6 prior to
seeding. |

Adding plastic media to the WWTP blower system. |

A new blower at the Waste Water Treatment Plant. |