Recent Site Activities (February 2009)
Separating concrete from terra cotta sewer pipe.
Terra cotta sewer pipe ready for removal.
Excavating a Storm Water Retention Basin.
Moving a manhole base to the staging area.
Installing a ground water monitoring well.
Sewer excavation.