EPA oversight contractor observes sewer removal activities. |

Excavating sewers near the Waste Water Treatment Plant. |

Excavating the storm sewer west of the Railroad line. |

Installing an overflow structure at a Sediment Retention Basin. |

Placing a section of sewer pipe into an end dump truck. |

Trucks wait to be loaded with soil that is being disposed of off
site. |