
Excavating soil in preparation for storm sewer installation. |

FMC site personnel collects a sediment sample with the EPA
oversight contractor.
|

Moving Bio Bed Reactor using biology to treat storm water at the
Waste Water Treatment Plant. |

Mowing the grass on Viscose Basin No. 5. |

Removing a portion of the 72-inch storm sewer.
|

Sewer removal near the Water Water Treatment Plant. |