Backfilling the storm sewer excavation.
|

Collecting ground water for analysis during the Annual
NTCRA-Basins Ground Water Sampling event. |

Installing storm water pipes to facilitate drainage from the
Former Plant Area. |

Installing fabric, stone and gabion baskets between storm sewer
headwalls.
|

Monitoring gas vents on Viscose Basins No. 4, 5 and 6.
|

Blue Ridge Governers School visit the site.
|