
Begin installing geosynthetic liner on Viscose Basins
Number 1 and 2.
|

Smoothing the surface of Viscose Basin Number 3 before
installing geosynthetic liner. |

First Annual On The River Community Outreach event in Front
Royal. |

Loading out soil and debris for off site disposal. |

Performing a weekly bridge inspection.
|

Weighing trucks to verify that they do not exceed DOT weight
limits. |