
Placing soil on top of the New Landfill.
|

Preparing to place straw on the new seed at Viscose Basin No. 7. |

Continue to load out impacted soil and debris. |

Preparing to spread seed on Viscose Basin No.7. |

FMC presents a donation to the Friends of the Shenandoah River
in memory of Don Orr.
|

Sample technician collects a soil sample with EPA's oversight
contractor.
|