
Former Sulfate Basin No. 5.
|

Installing geotextile and stone on Viscose Basin No. 9.
|

Pre-construction Viscose Basin No. 9.
|

Preparing to load gravel to the work area at Viscose Basin No.
9. |

Red fox in the Conservation Area.
|

Sewing geotextile panels together on Viscose Basin No. 9.
|