
Collecting depth to water readings from a ground water
monitoring well.
|

EPA oversight contractor watching a monitoring well being purged
prior to sampling.
|

Installing a gravel layer on top of Geotextile on Viscose Basin
No. 11.
|

Installing Geotextile on top of Viscose Basin No. 11. |

Pre-construction meeting held at Sulfate Basin No. 2 before
closure activities begin.
|

Site Manager provides a Remedial Update to Attendees of the
Annual Wine and Craft Festival. |